Jump to content

Welcome to Autoworld Forum !

Sign In or Register to gain full access to our forums. By registering with us, you'll be able to discuss, share and private message with other members of our community.

Close
Photo

SMART TUNNEL


  • Please log in to reply

#11
bOROi

Posted 08 February 2007 - 01:06 PM

bOROi

    Fast & Furious

  • Members
  • PipPipPip
  • 1,173 posts
Hope this is not another money making scheme....you know the usual rosy
financial projections followed by reduced usership and hue and cry about
the toll rates....and then Govt steps in like a white knight and
compensate.....

#12
derex

Posted 08 February 2007 - 02:35 PM

derex

    Advanced

  • Members
  • Pip
  • 84 posts
Brothers..

The smart tunnel's main objectives is to alleviate major flood in KL. It
channels the water from gombak river basin to a temporary pond in south
KL. It can hold millions of cubic metres of water during heavy rainfall,
before the water can be discharge gardually back into the system. The
lenght of the tunnel if i am not mistaken is about 11-13 km. But there
are only about 2-3 km accessible for motorists.

The road tunnel is the idea of our previous PM. As the flood tunnel will
will be going through KL anyway, so why dont take the opportunity build a
road tunnel.

I myself is a bit skeptical whether it can ease traffic congestion, but
again, that is not the main objective of the tunnel. And the extra cost
of bulding the road tunnel was not bear by the govt instead by the
konsortium. In return, they will be allowed to charge toll, and road user
will have the option whether to use it or not.

Hopefully
1. No more flash floods in KL
2. Ease traffic congestion
3. The toll rate is acceptable

win-win-win situation.

Do u guys think that this is a fair deal?


#13
bOROi

Posted 12 February 2007 - 02:30 PM

bOROi

    Fast & Furious

  • Members
  • PipPipPip
  • 1,173 posts
Yeah...when they start on a project, the outcome always look rosy, when
its in operation comes all the not so rosy solutions...increased toll
charges, compensation, guaranteed pfofits blah blah blah....then they put
the agreements under OSA. Now if its a fair deal why use the OSA???

We can only decide whether its a fair deal or otherwise if all the
agreements are open to scrutiny by the public....If they need OSA to stop
public scrutiny then we can assume theres hanky panky or berat sebelah
agreement there............

#14
Boink

Posted 12 February 2007 - 02:53 PM

Boink

    Road Warrior

  • Members
  • PipPip
  • 809 posts
Hello.

Can someone telme how to get on and off this new FREE highway?

want to have my share of free use before it gets toll-ed.:)

#15
tonykong18

Posted 12 February 2007 - 11:20 PM

tonykong18

    Taxi Driver

  • Members
  • PipPip
  • 364 posts
Hi Friends out there, B 4 using the Smart Tunnel, make sure it's not a
rainy day, make sure u have alot of time to spare and fill up ur tank cos
it sound like the exhaust system "4 2 1" I just joining the fun
don't "tambak" me if I am wrong. Ha Ha Ha.

rgdsWink

#16
Online

Posted 14 April 2007 - 02:53 PM

Online

    Veteran

  • Members
  • PipPip
  • 113 posts
It will be a quick fix for a few years,
then problems will start to come up again
as more and more people can afford to buy a car.

In Dubai their road is a 14 lanes freeway
7 up 7 down and flying smoothly nice i like that.

#17
silentwind

Posted 20 April 2007 - 08:41 AM

silentwind

    Taxi Driver

  • Members
  • PipPip
  • 360 posts
The tunnel start collect $$$ now? and how much the collect?
Last two months i pass the place but hvn't collect $$$.

#18
H2O

Posted 29 May 2007 - 02:11 PM

H2O

    Tokyo Drifter

  • Members
  • PipPipPip
  • 3,052 posts
I think many have confuse ... the tunnel is mean for flood not for
traffic. so is nothing to do with traffic jam or not jam ... why gorv
impost toll, so that can maintain this KL flood control system (if not who
going to pay the running cost).

buy one thing I feel that most of the people drive there very fast, didn't
they don't know the dangerous if drive high speed at tunnel ... sign board
already states 60km/j ....

#19
flee

Posted 29 May 2007 - 04:50 PM

flee

    White Lightning

  • Members
  • PipPipPip
  • 7,018 posts
SMART Tunnel - Govt. needed to build tunnel for flood waters but got no
money to do so. So they turn to crony company to build it. They then have
to figure out how they can pay for it and also make money out of it. With
a road, they can justify collecting tolls, even though the tunnel does
nothing to ease jams - it merely moves the bottleneck further down the
road.

So the SMART tunnel is anything but fair. It is just an excuse for crony
company to collect tolls to fund the project.

#20
geezee

Posted 30 May 2007 - 03:31 PM

geezee

    Driver

  • Members
  • Pip
  • 39 posts
it will surely jam at exit to jln tun razak and also jln sultan ismail
nothbound, soutbound only one lane exit to sh besi highway which just
before jln kucahi lama exit, bottleneck again.
so it doe snot slve the probelm, it is just having alternte way to create
more bottleneck or someone want to have fun or Fund.

2 sen concern.